Custom eDP Cable Solution for Medical Displays
Engineer fine-pitch eDP interconnects around your panel, mainboard, enclosure space, shielding strategy, and validation requirements.
- 46/48/50 AWG micro-coax options for compact display routing
- I-PEX, JAE, HRS/Hirose, KEL, and specified fine-pitch interfaces
- 1-piece prototype route; custom samples typically 5-10 working days
- Controlled lane, AUX, HPD, power, ground, and shield mapping
Build the eDP Link Around Your Actual Display System
Panel and Mainboard Inputs
- Connector family, pitch, keying, and mating direction are checked together.
- eDP lanes, AUX, HPD, power, ground, and shield functions are mapped before sampling.
- Unknown items can remain open for engineering review instead of being guessed.
- Photos, an old cable, PCB drawings, or a partial pin map can be used to start clarification.
Verified Assembly Release
A cable is not released for production simply because continuity passes. High-speed display links also depend on controlled pair geometry, connector transitions, grounding, shielding, routing, and the final system configuration. SINO-CONN uses the engineering sample to freeze the structure used later as the approved drawing and BOM.
- Mechanical fit is checked against connector orientation, bend zones, and enclosure space.
- Pin-to-pin, open/short, and auxiliary functions are verified before shipment.
- TDR or other signal-related checks can be added when specified by the project.
- Production follows the approved revision so material or pinout changes remain visible and controlled.
Choose an eDP Cable Structure for the Display Architecture
Different display layouts need different cable structures. Selection starts with panel interface, host location, available volume, routing geometry, power integration, and service requirements.
Micro-Coax eDP Harness
Ultra-fine micro-coax is the primary structure when the display enclosure has limited routing space and controlled high-speed pairs must remain compact. SINO-CONN can evaluate 46/48/50 AWG micro-coax, fine-pitch board interfaces, local shielding, tape wrapping, and reinforcement around the connector transition. The assembly is defined around lane count, AUX/HPD functions, total length, bend zones, and the exact panel-to-board route rather than a catalog cable outline.
Multi-Lane eDP Assembly
Multi-lane eDP assemblies organize several high-speed differential paths together with control, ground, and auxiliary conductors. Pair identification and physical organization are kept visible in the drawing so lane swaps, reversed orientation, or inconsistent routing do not become hidden assembly risks. Length, pair geometry, shield strategy, connector direction, and allowable breakout at each end are reviewed together before the sample structure is frozen for display-system validation.
Compact Folded Routing
Medical monitors and diagnostic terminals often leave very little free volume behind the panel. A folded or pre-shaped routing concept can reduce assembly interference when the path is already constrained by frames, boards, batteries, speakers, or mechanical brackets. SINO-CONN reviews bend locations, connector exit direction, local reinforcement, cable stack height, and service access so the cable can be installed without forcing a sharp bend directly at the fine-pitch connector.
Hybrid eDP Plus Power
Some display modules require high-speed eDP signals together with backlight, control, auxiliary power, or other low-power functions in one organized assembly. A hybrid structure keeps signal pairs, ground return, power conductors, and branch points defined in one controlled drawing. Physical separation, conductor sizing, shield termination, and connector pin allocation are reviewed so the added power path does not become an uncontrolled noise, heating, or assembly variable.
Panel-to-Mainboard Cable
For a fixed panel-to-mainboard connection, the cable can be optimized around exact host and display connector positions rather than built as a generic extension. Important inputs include connector P/N, contact side, orientation, overall length, enclosure opening, routing radius, and whether the cable crosses noisy power or motor sections. Short, direct routing can simplify the structure, but even a short eDP cable still requires correct lane, AUX, HPD, ground, and shield mapping.
Replacement eDP Assembly
When an original display cable is unavailable, expensive, or tied to a discontinued device, SINO-CONN can start from the old cable, connector P/N, photos, and a verified pin map. Replacement work is treated as an engineering change, not visual copying. Mating, orientation, lane assignment, wire construction, shield/ground method, length, and mechanical fit are checked before a new controlled drawing is approved. Original-brand or compatible connector options remain clearly identified in the BOM.
Define the Critical eDP Cable Specifications Before Sampling
A useful RFQ should identify the display link, connector system, signal mapping, mechanical route, materials, and validation expectations before pricing and sampling are finalized.
| Specification | What to Define | SINO-CONN Engineering Focus |
|---|---|---|
| Panel / Host Interface | Panel P/N, mainboard P/N, interface drawing | Confirm actual mating system and eDP link context |
| Connector | I-PEX, JAE, HRS/Hirose, KEL, or specified P/N | Pitch, orientation, keying, mating height, source status |
| Fine Pitch | Common micro interfaces may use 0.35, 0.40, or 0.50 mm pitch | Never assume equal pitch means compatibility |
| Micro-Coax Size | 46/48/50 AWG options where structure permits | OD, termination feasibility, routing space, handling risk |
| Lane / Function Map | High-speed lanes, AUX, HPD, power, ground | Prevent swapped lanes, reversed functions, or incomplete return path |
| Differential Impedance | Often around 100 Ω for eDP/high-speed differential links; final target per project | Cable geometry, connector transition, termination, test boundary |
| Length / Matching | Overall length and any pair-matching requirement | Signal margin, routing, assembly tolerance, serviceability |
| Shield / Ground | Local shield, overall shield, drain/ground connection | Continuous return path and defined termination points |
| Mechanical Route | Bend zones, exit direction, enclosure space, fixing points | Avoid connector-root stress and uncontrolled sharp bends |
| Validation | Electrical, dimensional, display function, TDR or project tests | Match test method to actual acceptance requirement |
Lock Connector and Pinout Details Before Tooling or Production
Exact Part Number Match
- A 0.50 mm pitch connector is not automatically interchangeable with another 0.50 mm family.
- Panel and mainboard drawings are cross-checked when available.
- Photos are useful for identification, but production release requires controlled interface information.
- Connector availability is confirmed against the required quantity at quotation time.
Lane and Function Mapping
- Pin numbering view and connector mating face are defined in the drawing.
- Lane polarity, AUX, HPD, power, and ground are reviewed as separate functions.
- Cable-side color or ID rules can be added for inspection and service.
- Any unknown pin is flagged for confirmation rather than filled by assumption.
Connector Exit Direction
- Exit direction is shown from a defined drawing view.
- Bend zones are kept away from the connector root where possible.
- Housing locks, latches, and retention features remain accessible after installation.
- A 3D space image or enclosure photo can be used when a full CAD model is unavailable.
Original or Compatible Options
Original-brand connectors may be required by program policy, while compatible alternatives can help when availability, cost, or lifecycle becomes a constraint. SINO-CONN keeps source identity visible and does not present compatible parts as genuine branded components.
- Original and alternative options are quoted separately when relevant.
- Mechanical fit, electrical ratings, contact system, material, and signal requirements are reviewed.
- Medical-related programs receive stricter change-control and approval handling.
- No alternative is released into production without the agreed engineering and sourcing approval route.
Select Materials for Signal Quality, Space, and Medical Equipment Use
Ultra-Fine Micro-Coax
- Finer AWG reduces routing volume but increases handling and termination sensitivity.
- Cable OD, connector compatibility, strip dimensions, and bend zone must be reviewed together.
- Pair assignment and shield continuity remain controlled through the termination area.
- Final selection follows panel requirements, mechanical space, and the approved sample.
Low-Loss Insulation
- Dielectric properties, wall thickness, OD, temperature, and termination process are considered together.
- Fluoropolymers can also offer useful chemical resistance for equipment environments.
- Final temperature or chemical claims are linked to the exact material grade.
- Material substitution after approval requires review because equal dimensions do not guarantee equal electrical performance.
Shielding and Ground Path
Foil, braid, local shield tape, micro-coax individual shields, conductive tape, and ground conductors can be combined according to the cable architecture. Shielding is designed as a complete return path from cable body through the connector transition rather than added as an isolated metal layer.
- Ground termination points are identified in the drawing.
- Shield opening length near the connector is minimized and controlled where possible.
- Power conductors and noisy sections are separated from sensitive pairs when the assembly combines functions.
- Any EMC conclusion remains dependent on the final equipment, routing, enclosure, and system-level validation.
Mechanical Protection
PET or polyimide tape, heat shrink, local sleeves, soft reinforcement, and controlled branch wrapping can protect the eDP bundle without making the connector root unnecessarily rigid. Medical-display enclosures often require a balance between thin routing and repeatable handling during assembly.
- Reinforcement is placed where abrasion, edge contact, or repeated service handling is expected.
- Heat-shrink length and recovered diameter are controlled to avoid squeezing micro-coax.
- Cleaning or chemical exposure is reviewed when the cable is near serviceable or frequently cleaned equipment areas.
- Any external jacket or sleeve is selected against actual flex, temperature, and chemical conditions.
Customize the Cable Around Your Display Mechanical and Electrical Constraints
Length and Routing
- Overall and section lengths can be dimensioned separately.
- Routing is reviewed for connector-root stress and sharp edge contact.
- Shorter is not always better if installation becomes difficult or strain increases.
- Approved dimensions are locked into the production drawing.
Lane and Auxiliary Mapping
- Numbering orientation is stated explicitly.
- Lane polarity and pair identity stay visible.
- Power and ground circuits are not hidden inside a generic “signal” group.
- Mapping changes trigger drawing revision before production and remain traceable.
Connector Direction
- Straight, folded, or reversed routing is reviewed from the correct viewing direction.
- Mating and service access remain part of the decision.
- Connector direction is shown graphically when text alone could create ambiguity.
- Physical sample fit can confirm the final orientation.
Shield Strategy
- Shield type and termination location are documented.
- Return-path continuity is reviewed through breakout areas.
- Sensitive pairs can be separated from integrated power paths.
- Final EMC performance is verified at the equipment level when required.
Mechanical Reinforcement
- Tape, heat shrink, sleeve, adhesive, and support length are selected by location.
- Bend transition is kept gradual where enclosure space allows.
- Reinforcement dimensions are added to the drawing.
- Any change in stiffness is checked against the intended route and installation method.
Identification and Packaging
- Cable labels can carry P/N, revision, or project-defined identifiers.
- Inner bag and carton labels can follow the approved packing specification.
- Connector protection is selected for shipping and line-side handling.
- Proprietary names, logos, and unreleased device information remain controlled under NDA requirements.
Prototype the eDP Assembly Before Freezing Production Details
Sampling should expose fit, mapping, signal, and routing problems while changes are still inexpensive. SINO-CONN supports low-quantity engineering validation before pilot or production release.
From Display Inputs to Engineering Sample
A custom eDP project can start from a complete drawing or from a smaller input package: panel P/N, host-board connector, connector photos, old cable, pin map, installation dimensions, and expected quantity. Engineering first separates confirmed information from open decisions. Connector identity, mating orientation, lane/AUX/HPD mapping, power and ground circuits, target length, routing space, shielding, and required tests are then organized into a drawing or specification for review.
Prototype quantity can start from 1 piece when the required connector and materials are available. For a normal custom eDP assembly, 5-10 working days is the typical custom-development range; simple builds using available materials may move through a 2-3 working day fast path. Lead time starts after critical inputs are confirmed and key components can be released, not from the first inquiry email.
- Inputs accepted: drawing, BOM, pinout, connector P/N, panel/mainboard P/N, photo, sample, or 3D space.
- Early sample goal: verify mating, pin mapping, fit, route, electrical function, and basic display operation.
- High-speed validation: add impedance/TDR or project-specific functional criteria when needed.
- Output: controlled drawing, sample identity, test record, open-issue list, and revision status.
Before sample release, engineering also records assumptions that still depend on the final device, such as panel firmware behavior, host-board validation, EMC limits, or enclosure changes. Keeping those items visible prevents a successful bench sample from being mistaken for final equipment qualification.
Prototype Review to Approved Revision
A working display is an important checkpoint, but “screen lights up” should not be the only approval criterion. The sample review should also confirm connector seating, cable exit direction, enclosure interference, fold position, strain at the connector root, pair organization, shield/ground method, dimensional tolerance, labeling, and any assembly instructions needed on the production line. Feedback is converted into a revised drawing instead of being carried forward as verbal knowledge.
SINO-CONN separates engineering sample, qualification sample, pilot, and mass-production release so each stage has a clear purpose. A revised sample may be required when pinout, connector, material, routing, or test criteria change. Once the assembly is approved, the final drawing, BOM, test method, and any Golden Sample or approved reference become the production baseline.
- Rev A can validate interface and fit; later revisions can resolve routing, reinforcement, or sourcing decisions.
- Production does not silently substitute connector, wire, shield, or material after approval.
- Pilot quantity is project-defined according to complexity, validation plan, material MOQ, and production volume.
- A released revision gives purchasing, engineering, quality, and manufacturing one common reference.
When the display platform changes, the approved cable is reviewed against the new panel, board, connector, route, or firmware requirement before reuse. Carrying an old cable forward without a compatibility check can create intermittent or hard-to-diagnose failures even when the connectors still mate.
Protect High-Speed Performance Through Geometry, Grounding, and Routing Control
Continuity proves connectivity; it does not prove a stable eDP link. Pair geometry, connector transition, shielding, grounding, length, and equipment routing must remain controlled together.
Control the Differential Path Through the Termination
eDP uses high-speed differential signaling, and a 100 Ω differential target is a common engineering reference for eDP/LVDS/MIPI-type links; the actual requirement still follows the display platform, connector system, and approved specification. Assembly performance can change at the connector transition even when the selected cable itself has a controlled nominal impedance. Strip length, shield opening, conductor separation, solder or contact geometry, breakout length, and sharp bends can introduce discontinuities near the termination.
SINO-CONN treats the termination area as part of the signal path. Micro-coax preparation dimensions are defined, pair identity is preserved, and the transition is kept as repeatable as the connector architecture permits. When the program includes an impedance limit, TDR or an agreed signal-related method can be added to sample or qualification validation. Measurements need a defined fixture, reference plane, configuration, and acceptance criterion; a generic “100 Ω cable” statement does not replace assembly-level verification.
- Define the interface, connector P/N, length, lane count, and acceptance target before requesting signal validation.
- Keep pair geometry and shield opening controlled through the connector breakout.
- Avoid unnecessary stubs, long exposed conductors, and unplanned pair separation.
- Freeze verified termination dimensions into the drawing or work instruction for repeat builds.
For programs without a formal TDR limit, the same discipline still matters. Consistent strip length, shield opening, conductor placement, and connector handling reduce build-to-build variation and make later troubleshooting far easier if a display issue appears during qualification or production.
Design the Shield and Ground Path Around the Equipment
Medical display equipment may place the eDP route close to DC power, switching regulators, processors, motors, wireless modules, backlight circuits, or metal enclosure structures. Shield performance therefore depends on more than the cable body. Ground termination location, connector shell or ground contact, local shield continuity, bundle routing, separation from noisy conductors, and chassis/board grounding architecture can all change the result.
SINO-CONN can review cable-level shielding and grounding against the provided equipment route. Individual micro-coax shields, local conductive tape, overall braid, ground conductors, and reinforcement can be combined according to the connector and mechanical design. Mixed signal-and-power structures are reviewed for physical separation where space allows. If an EMC issue already exists, route photos, grounding diagrams, failure conditions, and available test reports provide more useful inputs than simply asking for “more shielding.”
- Document where shield and ground connect rather than leaving termination implicit.
- Keep the return path controlled across transitions and branch areas.
- Review the cable route around high-noise sections before adding material blindly.
- Final equipment EMC compliance remains a system-level validation, not a cable-only guarantee.
Ground-path decisions should be reviewed together with the host board and panel grounding concept. A cable shield bonded at the wrong point can create a different problem rather than solving noise. Clear drawings and representative hardware checks are more useful than adding shielding layers without a defined return path.
Control Fine-Wire Production From Incoming Parts to Final Inspection
Stable production depends on part identity, repeatable micro-coax preparation, controlled connector termination, documented revisions, in-process inspection, and final verification against the approved sample.
Verify Connectors and Cable Materials Before the Line Starts
Incoming control begins with parts capable of changing the entire assembly: connector housing or plug, contacts, micro-coax construction, shield materials, tape, heat shrink, labels, and any project-specific auxiliary wire. Fine-pitch connectors are checked by exact P/N, series, positions, keying, orientation, visible condition, and lot/source information according to project requirements. Cable material is checked for AWG, conductor count, OD, color or identification, shield structure, and the approved material specification.
Connector availability is treated as a project variable. Original-brand material may be sourced through qualified channels, while compatible options remain separately identified and require approval before use. A visually similar connector is never introduced because it “fits.” Material substitutions are handled through change control because dielectric, plating, shield structure, stiffness, flame behavior, or termination characteristics can change even when dimensions appear similar.
- Incoming records link critical parts to the production lot or work order.
- Long-lead or limited-stock connector risks are identified before the release date.
- Approved BOM identity is checked before kitting.
- Any part change returns to engineering and program approval instead of being decided at the workstation.
Incoming inspection also protects schedule. A wrong connector reel or micro-coax construction discovered before kitting can be contained without contaminating work in process. For long-lead parts, source status and expected arrival are linked to the production plan before labor is scheduled.
Control Micro-Coax Preparation and Connector Termination
Fine-wire eDP work is sensitive to preparation dimensions. Excessive stripping can open the shield and disturb pair geometry; insufficient stripping can create poor access or unstable termination; conductor damage can weaken the joint; excessive heat can deform insulation or cause solder wicking. SINO-CONN uses first-piece checks and in-process inspection around stripping, shield preparation, contact or solder termination, insulation recovery, connector assembly, and retention.
For soldered micro-coax structures, inspection focuses on wetting, solder amount, bridges, conductor position, shield connection, thermal damage, and insulation recovery. For crimp/contact structures, terminal P/N, wire match, insertion position, retention, and locking features remain controlled. Microscope or magnified visual inspection is used where the geometry is too small for reliable unaided inspection. Work instructions should show critical preparation and termination references rather than relying on operator memory.
- First-piece approval is repeated after relevant material, tooling, or setup changes.
- Strip and shield-opening dimensions are controlled where they affect repeatability.
- Connector lock and retention are checked before the assembly moves forward.
- Abnormal findings are corrected at the process stage instead of waiting for final electrical failure.
Process records make recurring issues visible. If a termination defect repeats, engineering and quality can compare material lot, setup, preparation dimensions, operator instructions, and inspection findings instead of treating each failed cable as an isolated event. Corrective action can then be built into the controlled process.
Release Production Against the Approved Revision
Once the sample is approved, the production drawing, BOM, pinout, test method, and packing requirement become the baseline. Work orders and line documents use the released revision so a lane swap, label change, connector substitution, or reinforcement adjustment cannot enter silently. High-mix medical equipment programs can also use SKU-specific identification to keep different panel sizes or hardware revisions separated.
Inspection is built into the line. Critical operations receive first-piece and patrol checks; finished eDP assemblies receive the required electrical and visual verification before packing. SINO-CONN applies 100% basic electrical inspection as the standard production position, with project-specific signal or functional tests added where the approved requirement calls for them. Packing is treated as the final controlled manufacturing step, including part identity, quantity, connector protection, and shipment labeling.
- Production follows approved drawing/BOM/pinout and controlled changes.
- 100% basic electrical verification can include continuity and open/short checks.
- Visual, dimensional, connector-lock, shield, labeling, and packing checks follow the project plan.
- Inspection and test records can be organized for traceability when required by the program.
For repeat orders, the released baseline also shortens re-qualification effort because the same part identity, preparation method, test logic, label format, and packing instruction can be called back by revision. Changes remain visible, while unchanged controls do not need to be reinvented for every release.
Match Each Validation Method to a Real eDP Failure Risk
Testing should answer a defined engineering question. Electrical continuity, display function, impedance, mechanical fit, and documentation each cover different failure modes and should not be treated as substitutes.
| Validation Item | What It Checks | Typical Use in an eDP Medical Display Program | Output |
|---|---|---|---|
| Pin-to-Pin Mapping | Correct circuit assignment at both connectors | Every new pinout or revised mapping | Mapping record / tester result |
| Continuity / Open / Short | Basic electrical connection and isolation between circuits | 100% basic production verification | Electrical test record |
| Visual / Dimensional | Connector condition, exit direction, length, reinforcement, labeling | First piece, sampling, final inspection | Inspection record |
| Connector Mating / Retention | Fit, lock engagement, orientation, handling | Sample and qualification | Fit confirmation / inspection |
| Insulation / IR / HiPot | Electrical insulation where project design requires it | Power/auxiliary circuits or specified quality plan | Test record with criteria |
| Differential Impedance / TDR | Discontinuity through cable and connector transition | When the eDP specification includes an impedance target | TDR record with fixture/criteria |
| Display Functional Check | Actual panel-host communication, image stability, wake/HPD/AUX behavior | Sample validation when representative hardware is available | Functional validation note |
| Routing / Bend Fit | Installation clearance, bend zone, connector-root stress | Compact enclosure and folded routing | Fit photos / approved route |
| Project-Specific Reliability | Flex, chemical, temperature, vibration, or other defined exposure | Only when required by equipment use or qualification plan | Agreed test report |
Keep Medical Display Documentation Tied to the Approved BOM
QMS Scope Verification
- A QMS certificate does not automatically certify every finished cable.
- Medical display cable acceptance still follows the approved drawing, BOM, test criteria, and equipment requirements.
- Certificate copies can be reviewed during supplier qualification where applicable.
- Any safety-critical or regulatory claim is tied to controlled evidence rather than a general website statement.
RoHS and REACH by BOM
- Material compliance can be organized against the approved BOM.
- Supplier declarations or test evidence are checked according to the required documentation route.
- BOM changes can trigger re-review of compliance evidence.
- When project-level verification is not complete, wording remains “compliant material options/documentation available” rather than an unsupported universal claim.
Traceability and Revision
- Drawing, BOM, pin map, label, and packing requirements carry revision identity.
- Critical connector and cable lots can be linked to production records when required.
- Approved changes create a new controlled revision instead of overwriting the old specification.
- Program-specific drawings, pinouts, and unreleased device information are handled under NDA and need-to-know access.
Inspection and Test Documents
Documentation should make the assembly verifiable to engineering, quality, and sourcing teams without relying on informal email explanations. Depending on program requirements, SINO-CONN can organize drawing records, sample inspection, electrical test results, dimensional checks, material declarations, and shipment-related documents.
- Reports identify sample or lot, revision, method, criteria, and conclusion.
- COC/COO or other shipment documents can be prepared when required by the project.
- Test reports distinguish internal inspection, supplier evidence, and third-party testing.
- Confidential project records are not reused as public marketing material without permission.
Representative Medical Display Programs From Prototype to OEM Production
Portable Diagnostic Display
- Structure: ultra-fine micro-coax eDP with localized reinforcement.
- Review focus: connector orientation, lane/AUX/HPD mapping, fold position, ground path, and installation sequence.
- Prototype gate: mating, pin mapping, display function, route fit, and dimensional approval.
- Production gate: released drawing/BOM, 100% basic electrical inspection, label/revision control, and protected packing.
Bedside Monitoring Display
- Structure: multi-lane eDP micro-coax bundle with defined ground/shield termination.
- Review focus: pair organization, power/ground assignment, connector source, and separation from noisy internal routing.
- Prototype gate: electrical mapping, representative display operation, mechanical fit, and shield/ground confirmation.
- Production gate: material identity, controlled termination, connector lock, electrical test, inspection record, and revision-specific packaging.
Imaging Workstation Display Module
- Structure: panel-to-mainboard eDP assemblies managed as separate controlled SKUs.
- Review focus: exact P/N, pin map, length, connector direction, part label, and packing identity for each revision.
- Prototype gate: one approved sample route per SKU and documented mapping confirmation.
- Production gate: revision-locked BOMs, separate kitting, first-piece verification, 100% basic electrical checks, and lot/label traceability.
Plan Prototype, Pilot, and Production Timing Before the RFQ
Lead time is driven by connector availability, drawing maturity, material readiness, validation scope, and tooling. Early quantity planning helps separate sample needs from recurring OEM supply.
| Project Stage | Typical Quantity / Commercial Reference | Typical Timing | Main Conditions |
|---|---|---|---|
| Engineering Prototype | From 1 pc when components are available | Simple 2-3 working days; custom eDP commonly 5-10 working days | Critical P/N and pinout confirmed; no major new tooling |
| Standard Custom Development | Low-quantity sample build | 3-7 working days for standard custom; complex high-speed builds can require 5-10 working days | New BOM, drawing, fine-pitch assembly, validation scope |
| Pilot Build | Project-defined | Commonly 1-3 weeks depending on complexity and material readiness | Approved prototype, near-production materials/process/test |
| Standard OEM Production | Production MOQ basis from 100 pcs; many brand releases are 500 pcs+ | Small/standard orders commonly 5-7 working days | Approved revision, available materials, standard validation |
| Fully Customized / Larger Release | 500 pcs to multi-thousand-piece program | Commonly 10-25 working days | Connector procurement, assembly, testing, final packaging |
| Tooling / Special Components | Project-defined | 10-25 working days or longer; new housing/terminal tooling may extend further | Mold, fixture, custom cable, long-lead connector, special qualification |







eDP Medical Display Frequently Asked Questions
Send Your Medical Display eDP Requirements for Engineering Review
- Panel model and host-board model or connector P/N
- Pinout, lane mapping, AUX/HPD, power, and ground information
- Target cable length, exit direction, fold or bend locations
- Installation drawing, enclosure photo, or 3D space when available
- Prototype quantity and expected production release quantity
- Required electrical, signal, dimensional, material, or compliance documents
- Target sample date and production schedule